What is ramp period?

Contents

What is ramp period?

Ramp Period means the period commencing on the Closing Date and ending on January 29, 2020 or such later date as may be agreed upon by the Borrower and the Controlling Lenders. Sample 2. Ramp Period means the time period covered by the Ramp Schedule.

What is ramp up and ramp down in JMeter?

Ramp-down in Apache JMeter™ is the amount of time it will take JMeter to stop all running users. Unfortunately, JMeter doesn’t have a default ramp-down feature. Therefore, the default ramp-down time is 0 seconds for each scenario that is implemented using the regular Thread Group. Number of Threads: 100. Ramp-up: 0.

What is ramp up and ramp down in performance testing?

Q. 58 What is Ramp-up and Ramp-down? Ans: The user ramp up decides the rate at which virtual users add to the load test whereas ramp down instructs LoadRunner at which rate virtual users exit from the load test.

What is loop count period in JMeter?

Most people are aware of the fact that a thread simulates a user and loop-count means the number of times the thread will make request. Let’s walk through the differences. In Scenario 1, 10 threads are used, and the ramp-up period is 10 seconds, so JMeter will take 10 seconds to get all 10 threads up and running.

Whats another word for ramp-up?

What is another word for ramp up?

advance increase
addition enlargement
extension intensification
run-up step up
ascension rising

What is ramp-up process?

The term ramp-up refers to when a company substantially increases its output in response to increased demand or an expected increase in the near term. Start-up companies also ramp up once they leave the prototype stage and begin regular production for the market.

What is the ideal ramp up period in JMeter?

The ramp-up period tells JMeter how long to take to “ramp-up” to the full number of threads chosen. If 10 threads are used, and the ramp-up period is 100 seconds, then JMeter will take 100 seconds to get all 10 threads up and running. Each thread will start 10 (100/10) seconds after the previous thread was begun.

What is another word for ramp-up?

What does ramp-up mean in performance testing?

Ramp-up is the amount of time it will take Apache JMeter™ to add all test users (threads) to test execution. Or in other words, how long it will take to JMeter to start execution of all the threads. For example: 1000 target threads with 1000 seconds ramp-up: JMeter will add one user each second.

How set ramp up period in JMeter?

First, guess the average hit rate and then calculate the initial ramp-up period by dividing the number of threads by the guessed hit rate. For example, if the number of threads is 100, and the estimated hit rate is 10 hits per second, the estimated ideal ramp-up period is 100/10 = 10 seconds.

What mean ramp-up?

Key Takeaways. The term ramp-up refers to when a company substantially increases its output in response to increased demand or an expected increase in the near term. Start-up companies also ramp up once they leave the prototype stage and begin regular production for the market.